Northwest Regional Water Treatment Plant Upgrade

Aerial view of the water treatment plant

Project Files SERVICE AREAS PDF COMMUNITY PRESENTATION PDF Conceptual Design Transitioning to Softened Water Improvements at the Northwest Regional Water Treatment Plant will soften and enhance water quality and increase system reliability. The public water supply in Greene County comes from underground sources. As the water is pumped to the surface, it passes through limestone, […]

Well Network Optimization

Newly Constructed Well Design Project Status Planning – 2020 Design – 2021 Construction – 2021 Completed – 2025 FAQS What is a well? A well is a hole drilled into the ground to access water contained in an aquifer. What is an auqifier? An aquifer is a body of porous rock or sediment saturated with […]

Booster Station & Transmission Line Improvements

Water Main Projects Find details for each water main project below:  2101WA Kemp Road Water Main and PRV: Line extension and installation of PRV for secondary feed to Vista Manor neighborhood.   2005SA Beaver Valley 12: In-line extension for secondary feed for Nathaniel’s Grove subdivision.   2008WA Oleva Drive: 12-inch line extension to provide water to Clyo system […]

Water Metering System Upgrade

SIGN UP Project Status Planning – 2020 Design – early 2021 Construction – Fall 2021 Completion – late 2024 FAQS What is an advanced metering infrastructure (AMI)? AMI uses enhanced water meters which wirelessly communicate water usage data directly to GCSED. The information is used to monitor how the water system is performing and provide […]